Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the simple-lightbox domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/orobitg/public_html/wp-includes/functions.php on line 6121
Client : Government of Andorra Architect : Orobitg – Architecture and Urbanism Projected area : 5.951 m² Pre-Project : 2005 Construction : — Cost : 13M €
We participated as engineering consultants in the competition for the construction of a building for a school located in Encamp, Andorra.
It was required a preliminar dimensioning of the earthworks and stabilization of slopes, structures, building services, security, evacuation and fire engineering.