Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the simple-lightbox domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/orobitg/public_html/wp-includes/functions.php on line 6121
Client : Grup Nòrdic Architect : Orobitg – Architecture and Urbanism Construction area : 13.551 m² Project : 2000 Contruction : 2001/02 Cost : —
Just next to the base of the ski resort – El Tarter – lies this 4-star hotel with all the facilities to enjoy a comfortable stay surrounded by a very healthy and natural environment.
The excavation was completely in a layer of slate rocks (2 basements), the structure was designed in reinforced concrete and the building services solved the complex program that a hotel of this category requires