Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the simple-lightbox domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/orobitg/public_html/wp-includes/functions.php on line 6121
Client : Grup Calbó Architect : Orobitg – Arquitectura i Urbanisme Construction area : 13.340 m² Project : 2005/06 Contruction : 2007/09 Cost : —
In the village of Soldeu, Andorra, there is a unique 5-star hotel surrounded by an amazing natural environment, probably, one of the best in the Pyrenees.
A project that includes almost all the challenges in the field of engineering applied to buildings : An excavation with a cut of over 18 meters high and 100 meters long that restrains the main Road Nº2, a huge reinforced concrete structure with many peculiarities (high variable actions, rest of supports bearing up to 6 levels over down-stand tranfer beams, shear walls, expansion joints avoiding double support), and all the requirements in the field of building services and fire engineering that a project with this size demands to.