Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the simple-lightbox domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/orobitg/public_html/wp-includes/functions.php on line 6121
Client : Molines Patrimonis Architect : Orobitg – Architecture and Urbanism Construction Area : 9.498 m² Project : 2000 Construction : 2001/02 Cost : —
This building has 3 levels of parking, 3 levels of commercial area, a restaurant and a 4-star hotel (66 suites) that rises up to 8 floors over the Dr.Molines street, in Andorra la Vella.
We collaborated on the excavation project that was carried out in granite rock by controlled blasting and works with hydraulic hammer.
The structural project was designed as a skeleton of reinforced concrete, where it is highlighted the rest of 3 supports (that bear up to 5 levels) over different down-stand transfer beams on the roof of the commercial area.